Space Allocation

Space planners split a building between departments before anyone gets a desk. Our product handled the step before and the step after. For the middle step, customers took a screenshot of our floorplan into PowerPoint and drew rectangles on it.

I owned the design of the missing step end to end.

Shipped in June 2026

Space Allocation closes a gap that competitors had already closed. It lets Sales go after Strategic Space Planning deals, and customers can stop the PowerPoint workaround.

In user interviews, planners recognized the flow right away, because it matched how they already work. One customer told us that if they had this a year earlier, it would have saved them a lot of spreadsheets. Enterprise customers upgrade on managed cycles, so usage data comes in as they move to the new version.

When it does, I would look at three things:

  • How often planners switch between allocating space and assigning people
  • Number of clicks to reach a floorplan
  • If planners open the stack plan from the toolbar

The missing step

I started with a competitive audit of SerraView, Archibus and OfficeSpace. All three had a paint bucket, live capacity counters and the same colors across views. That told me what table stakes looked like.

A call with a space planner showed me the rest. I watched them draw rectangles over a PowerPoint screenshot of our floorplan, zone by zone. Blocking is two steps: first floor area goes to departments, then people go to desks. Our product only had the second step, so the first one happened outside it.

A screenshot of customer's PowerPoint: Building 12 floorplan with colored zones and space allocation data

Internally, people saw Blocking as one step, people to desks, so that is how it was scoped. When I showed stakeholders the planner's screenshot, it clicked right away. They could see how Stacking and Blocking connect. The screenshot also set the approach for the rest of the project.

$750K in lost deals

A pass through ProductBoard turned up three lost deals, $750K ARR in total, tied to navigation. Users needed 8 clicks to reach a floorplan. That was the same part of the product I was about to change.

Then the alignment call changed the project. Engineering was buried in bugs from the last release and had a short timeline. New concepts meant refactoring we could not afford. So I chose to extend the existing UI instead of inventing a new one.

That constraint made the navigation fix almost free. I brought an interactive Figma Make prototype, built from existing components, to the next call, so the cost was visible right away. I led with the business value and the lost deals, and the PM approved the bigger scope.

Old entry point: an empty Workspace Manager that asks for Region, Campus, Building and Floor
Redesigned entry point: building cards with favorites, capacity and occupancy

Familiar patterns

Drag and drop was an early decision. Planners knew the pattern and it was fast to build. The hard case was one department in many locations. For that I added a floating panel that shows what is selected, and a badge on the department card while you drag.

Supply and demand counters bring the Stacking plan into Blocking. Planners see their target next to what they allocated, without a change of view.

Drag interaction and floating action panel for allocate capacity to a department

My first idea was a strict order: allocate floor space first, then assign people. The planner sessions proved me wrong. In a large organization, several planners can work on one transformation, and a manager or leadership approves each part. Planners send one part for approval and keep working on the rest, so they move between the two steps all the time. So a tab in the existing panel lets planners switch between Allocate Capacity and Assign People at any time.

Usability testing found one last gap. After allocating, planners could not find the right people. A "Find People" shortcut now filters straight into the Assign People tab.

Find People shortcut filtering into the Assign People tab

Looking back

The engineering constraint did me a favor. It narrowed the solution, and the narrow solution showed me a second problem I could fix (almost) for free.

Strategic planning happens every 3 to 5 years, so direct access to planners is rare. I made up for it with people who had done the job: an SVP who used to be a facility manager, and our Solution Architects. Competitive research filled the gaps. Two sessions with real planners then changed how the design handles the two steps.

Role

  • Sole product designer

Year

  • 2025-26

Project type

  • New workflow
  • Research
  • Enterprise

Tools

  • Figma Make
  • ProductBoard