Stack Planning

Prospects asked about Stacking in almost every sales call. Customers who had it did not use it. They went back to Excel.

I led the redesign. Halfway through, the team lost two senior engineers, and the project had to get smaller and smarter.

Stacking 2.0 interface design

A contract saved

  • An enterprise customer that was about to leave renewed its contract after it saw the new Stacking in a demo.
  • Within weeks of GA, Sales reported that prospects were more interested in Stacking.
  • The v0 prototype changed how engineers worked with design. They worked from a live prototype, not a static spec, and reused about 80% of its code.

A vague brief

The brief was one line: "Improve the usability of Stacking." That could mean anything. So I worked backwards from one question: what would bring customers back from Excel? A tool that is easy to use, feels familiar and follows industry standards. I scoped it to the diagram, where the pain was easy to see, and proposed that scope to the PM. Hover broke the layout. Parent and child departments looked the same. Colors failed contrast. We thought this alone would fill the team's capacity.

Stacking diagram with its usability issues annotated
  1. WCAG color contrast standards are not met
  2. Floor's width is determined by its capacity. This reduces the real estate and also breaks the visual rhythm
  3. Stack bars are so tiny making them unusable
  4. Insufficient real estate for smaller buildings
  5. Parent departments legibility issues

Then two senior engineers moved to another team. Our 2.0 plan, a new row-based layout with a full interaction overhaul, was no longer possible.

I asked one question: which fixes help users now and still carry over into 2.0? The Engineering Lead and I agreed on five. The hover fix, parent and child legibility, error handling, a color system and a floating action panel.

The real blocker

With the diagram work set, I went back through old research recordings. Something we had skipped kept coming up. Users did not understand the Space Projects screen. They thought the folders were projects.

I checked it with a prospect who was evaluating Stacking. Same confusion. People were getting stuck before they even reached the diagram.

Old Space Projects home page with its usability issues annotated
  1. Search feature wasn't intuitive too
  2. Users were confusing folders with projects
  3. Project types lacked clear visual differentiation and users were relying on project names instead of system cues

It was not in scope. I did not wait. I designed a lightweight fix and brought it to the team. I used only existing components, so the engineering cost was low. Leading with the solution paid off. The team said yes.

Old Space Projects home page
Space Projects dashboard with card-based layout, search, and inline filtering

Prototyping in v0

Hovering a bar pushed nearby content off the canvas. A Figma prototype of the fix would have taken hours. I built it in v0 with a few prompts. It was the first AI prototype at Nuvolo. Engineers were used to static specs, and here was something they could click, inspect and build from. That got them excited. In the end, about 80% of the prototype's code went into the product.

The other fixes were smaller:

  • Floating action panel. Actions appear when you select something, so you do not have to look for them.
  • Parent departments. Clear parent and child styles, and tooltips that show issues where they happen.
  • Unallocated buckets. Spacers that keep widths equal, which also solved a front-end problem, and work as a progress bar in reverse.
Contextual floating action panel above a selected departmentTooltip explaining a parent department count mismatchStacking 1.5 design with buckets, floors and allocation progress

Looking back

Each release should set up the next one. I like to look at the whole picture first, then scope down. Early on, I could see that the full 2.0 vision was a stretch for our team. So when two engineers left, I already had fixes in mind that lead toward 2.0. None of them will need rework when 2.0 ships.

Playing the long game has been the right call for most design problems I have worked on.

Feedback received from Eng Lead and PM

Role

  • Sole product designer

Year

  • 2025

Project type

  • Redesign
  • Research
  • AI prototyping

Tools

  • Figma
  • v0